Print
Hits: 3346

Last week I finished triming the counter weights on both elevators. It was quite a labourious process, with a lot of trim and check the balance, as I wanted to be sure to not trim too much.

I dimpled all the holes in tail surface outboard ends, and I countersunk the fibreglas tips to accept the dimples. I've still got a bit of touch up work to do on the empennage tips before riveting them in place.