Here are the completed flaps. I finished the left one last night, and the right one today.

I have been building both flaps in parallel. After I do a step on one flap, I do the same step on the other. This saves a lot of plans reading and setup time.

The left aileron can be seen in the jig in the background. I will start riveting the skins to the skeleton the next work session.

The step ladder visible in the background is used to hang a plumb bob from to make sure that the ends of the aileron and flap jig are vertical. This makes sure that the surfaces are built without a twist in them.

I made good progress on the two weeks of vacation that I just finished. It looks like I am heading back on the road for two weeks, so the project stops again.