Here we are a bit further along in the process. I have to fabricate and install the F-802H angles, which goes between the floor and the aft face of the landing gear box. Then I will remove the landing gear box assemblies from the fuselage, and finish drilling the holes from the F-802A and B into the Wd-822, and the ones from the F-802C into the F-802E. I drilled enough of those holes already to hold everything in the right position, and it will be a lot easier to do the rest of them on the work bench where I can reach everything without twisting myself into a pretzel.